Building a new concept of excellence around the world
Haulage of Backfill Material or Engineered Fill from Employer’s stockpiles 0-10 km from the site boundary
(663,980.60) Filling general with selected Backfill material or Engineered Fill, compaction to 95% Modified
Proctor (1,000,000.00) Excavation of Satisfactory Soils (301,050.00)
Jeddah
2013 - 2016
74 m2