Building a new concept of excellence around the world
Construction of main lines & sewage networks
Including mobilization/site preparation, supply& apply materials, equipment, manpower, excavation of trenches
Beding preparation, installation of Upvc pipelines (200,300,400,500,600,700,800,900 & 1400 mm diameter)
Installation of manholes (depth 1.2-10m average), building tie-in of IC's, backfilling, asphalt paving, maintenance of roads.
Duba
Tabuk
2011 - 2014
20 m2