The Initial Site Preparation for Logistics Facilities in the Connecto (CH00+000 to CH75+000) Site clearance, excavation and filling, haulage of excavated material, installation of steel fences & gates, road paving (663,980.60) Filling general with selected Backfill material or Engineered Fill, compaction…
Sindalah Island Cluster 5 Substructure Works on Luxury Resort South
Sindalah Island Cluster 5 Substructure Works on Luxury Resort South Casting of blinding concrete Waterproofing installation Reinforcement of (ground beams, raft foundation, column pedestals, walls, installation of construction joints) and all to be casted by concrete Location Sindala Timeline Apr 2023…
Ras Gasabah Shore base
Ras Gasabah Shore base Design and built the following items: Infrastructure (potable, firefighting, storm, electrical, security, CCTV – networks/ system) Construction Trucks Services area Construction Laydown area, multiple prefabricated buildings. Security fence, Supporting Utilities, Helipad, Car Parking, Base yard internal roads…
12 Initial Site Preparation for EMS & EMR (L1) Coastal Region
12 Initial Site Preparation for EMS & EMR (L1) Coastal Region Site clearance, excavation and filling, haulage of excavated material, installation of steel fences & gates, road paving Installation of steel fences & gates. Road paving Location Tabuk Timeline Oct…
Site Preparation (Mass Grading Project)
Site Preparation (Mass Grading Project) Haulage of Backfill Material or Engineered Fill from Employer’s stockpiles 0-10 km from the site boundary (663,980.60) Filling general with selected Backfill material or Engineered Fill, compaction to 95% Modified Proctor (1,000,000.00) Excavation of Satisfactory Soils…